Deleting Material Cost EstimatesYou can delete costing results that are no longer required from the database when you specify certain criteria. This function is called Reorganization .
A cost estimate can only be deleted if it is not locked.
A standard cost estimate is used to determine the standard price for the valuation of a material. Some countries legally require that the cost estimate used to calculate a standard price be kept on hand. You should therefore find out whether there is a legal requirement to archive your standard cost estimate. It is also recommended that you contact the accounting department and inventory management before deleting cost estimates.
If you delete a current standard cost estimate, the fields for the current standard cost estimate in the material master record (Costing
details
) are reset to zero. If you use the Material Ledger, when you delete a standard cost estimate the standard prices are also deleted in the Material Ledger master data. The master record for the material then no longer contains a current standard price from a standard cost estimate.
If you are going to delete a large number of cost estimates, the background mode is recommended.
Online:
Choose
The
Reorganization of Cost Estimates
screen appears.
Specify which cost estimates you want to delete:
Enter the company code, plant and material number.
Select one of the following options under
Control parameters
:
Future standard cost estimates
Current standard cost estimates
Previous standard cost estimates
Cost estimates not in material master
You can only select one of the 4 options.
If these selection criteria are insufficient, you can further restrict your selection via
, for example by
costing status, costing variant or costing version
costing run
all cost estimates, only additive cost estimates or only cost estimates without quantity structure
If you want to simulate the deletion run first, select
Test run
.
Set the
With list
indicator if a log is to be issued listing all deleted material cost estimates (or in the case of a test run all material cost estimates to be deleted).
Choose
.
In the Background:
Choose
The
Reorganization of Cost Estimates
screen appears.
Choose .
The dialog box
Background Print Parameters
appears.
Enter the required data (background print parameters) and choose
.
If you want to execute the program in the background
immediately
, choose
Immediately.
If you want to schedule the job, enter the necessary data:
Specify when the program is to be executed. The program is executed automatically at the specified time.
Choose
Date/Time
to specify the exact point at which background processing should start.
Choose
After job
if you want to specify that background processing should not start until another job has been completed, or
After event
if processing should not start until an event has occurred.
Choose
At operation mode
if you want to specify that the job should run only at the weekend, for example.
Specify whether the program is to be executed once or at regular intervals.
If the job is to be repeated regularly, set the indicator
Execute job periodically
.
Choose
Period values
to specify how often the job should run, such as weekly or monthly.
Choose
to save the data for background processing.
To display the job, choose . For more information, see Background Processing .
When you delete a material cost estimate, the following data is deleted:
Basic costing data
Cost component split
Itemization
Log
In test run mode, a list appears showing the cost estimates that can be deleted.
In the reorganization mode, the system issues a message detailing the number of cost estimates deleted.